Just testing

Just setting up the blog on the off-chance that I have the time and inclination to post anything.

The house is coming on slowly, we are still putting on the clay mix (3 parts sand, 1 part clay, 1 part chopped straw) two weeks after starting; ten hours a day. We are getting close to finishing the third wall so if all goes well we should have all external walls done by the end of the week (22nd September). Then we can start all over again with the lime render and get the exterior weather proofed before the cold weather and frost starts.

Windows are due at the end of the month, closly follwed by the doors, and with luck the building of an cooking range (piec or kuchnia in Polish).

Advertisements

Author: Eddy Winko

Trying to leave the rat race and live a less hectic and harmful life. From the building of a straw bale house to the composting toilet diaries; read my blog https://winkos.wordpress.com/

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s